Saturday 23 November 2013
























10/06/14
Landscaping 
A big thank you to Mum and Dad! 












































































A special thanks to Aunty Di 
 & Kerry for your fabulous lunch xo 















































































20/12































16/12





























14/12








Window frames cleaned 

Garage door painted 


Correct range hood 














Finally we have basins and taps!

13/12











03/12


















29/11


Fly screens are on, and front door stained











25/11


Sample of driveway, the 1st one. 






Marking for driveway and letterbox 



Basins have arrived 






Garage roller door down 














22/11

The temporary fencing has come down. 13 days til Practical Completion Inspection 
Still waiting on our ensuite and bathroom basin. The one we selected is not available any more, so we had to re-select yesterday. 







Front render being completed 



Cesear stone bench tops put in. 





Benchtop 





Master bedroom, Carpet  

Master bedroom 




Ensuite shower screen and mirror installed 


Ensuite 
















Bathroom Shower screen and mirror installed 





























12/11











Tiling 



Master Bedroom


Looking into ensuite







Laundry 





+






Close up of the tiles. They look a lot lighter in person. 






Ducted heating control

Down lights in kitchen




Fridge tap point


WIP power points 

Bedroom 2



Bathroom 















PCI should still be 3 weeks away. 










01/11

The painting is almost finished. 
It's a long weekend this week because of Melb. Cup, so tiles should start next Wednesday. There is no official date for PCI yet, but likely to be first week of December.  





























Here is our colour selections for those who are at interested, it' always hard to pick from a little square. 

Bricks: Cat 2 Glenfern 
Mortar: Rolled Joints
Mortar Colour: Off white
Infill above garage door colour: Colorbond Dune 
Render: Dune
Alfresco beams post colour: monument 
Meter box colour: monument 
Roof tiles: Cat 1 Macquarie  - Colour Ebony 
Fascia and gutter: monument
Portico ceiling colour: white
Wall paint colour: Flokati 
Kitchen overhead cabinets: Blackened Linewood
Kitchen cabinets and laundry: Sarsen Grey 
Ensuite and Bathroom cabinets: Licorice Linear 
Caesar stone benchtop  to kitchen, bathroom and ensuite: Cat  1 Osprey 
Benchtop edge: Pencil round











24/10



Our new front door has been put on, the bricks have been cleaned, and the bathrooms have been waterproofed. Once the plasterer has finished, painting and tiling is next. 








 Garage door to the backyard. 











Bathroom 

Ensuite













22/10














Lock up stage complete 18/10


16/10












15/10







11/10


Master bedroom 


Master bedroom 

Ensuite 

Ensuite 

 Master bedroom window 

Front entry 

Front Linen cupboard 



WIP 






 Bathroom 

























08/10









Water point for fridge in the correct spot













07/10



Bricklayer is starting Tuesday. Insulation is in, roof tiles fixed, plasterboard arrived, and noggins put in.  







Plaster board arrived








Manhole. Ducted heating in the background



Roof tiles fixed that were knocked off in the wind 


Insulation family room 

Master bedroom/ensuite 


Bedroom 2 and ensuite

Bathroom 

Rumpus 

 Bedroom 4

 Rumpus 


Bedroom 2











Berwick Waters entry sign 













06/10










03/10


Front door to be changed


Bedroom

Ensuite


Plumbing in ensuite


Plumbing in Ensuite

Kitchen plumbing

Fridge space with the wrong position of the water tap, meant to be on the side - has now been fixed 


Laundry plumbing

Bathroom

Shower plumbing in bathroom




Bathroom


Toilet

Kitchen

Internal garage door

Rumpus cavity door


Missing roof tiles in the wind

Front linen cupboard

Ensuite cavity sliding door















30/09












Garage framing 


 Master bedroom window 

Master bedroom 

Master bedroom 


Laundry 

Family room 

Family room 
Alfresco

Looking back at garage/laundry 

  Looking towards front of house 

Kitchen 


 Study 


















27/09 

Lot's has been happening! The frame was completed, the windows and sliding doors are in, and the roof tiles were being laid today. Bricks should be arriving next week. 





Garage Front Entry 


Master bedroom windows 




Ensuite 


Bedroom 


Toilet 


Bathroom



Looking through into bed 4 and rumpus 


Backyard 


Back of the house 
















24/09

More frame







18/09

Frame started 








11/09

Slab Stage complete 



Front Portico






















06/09


Front Garage










Alfresco







The portaloo has arrived!

We settled our block on the 25th of July, with a site start date of 28th of August. Slab pour due on 09/09.